
Expansion, movement and construction joints cut out, primed and resealed — carparks, podiums and slabs across Sydney. Priced per lineal metre.


Joint sealing replaces failed sealant in expansion, movement and construction joints. The old sealant is cut out, the joint is cleaned and primed, a backing rod is set to depth and a new sealant is applied, so water and debris can't get into the joint.
On a carpark, podium or slab the joint is where water gets through first. Done properly, the joint is sized for the movement it has to take, the sealant bonds to two sides only, and it's logged run by run so you know exactly what was done and where.
Failed joints rarely look dramatic from above. The damage shows up underneath — or the next time the slab moves.
Water through a joint doesn't stop at the joint. It gets to the reo either side, and a cheap reseal turns into concrete cancer work on your program.
Water through an open joint reaches the reinforcement either side. Leave it and the reseal becomes a breakout and patch repair.
Joints over carparks, retail and plant rooms leak onto cars, stock and services — and the call goes to the builder.
Joints that leak at inspection or in the first rain hold up handover and come back as defects in the DLP.
We don't run new sealant over the old bead. Every failed run is cut out, prepared and resealed so it moves with the slab.
We walk the joints, mark each failed run and measure it in lineal metres before pricing. Cracks running off a joint go to crack injection, not under the sealant.
Old sealant and debris come out, the arrises are cleaned back to sound concrete, and broken edges are rebuilt before anything goes in.
Primer to the joint faces, a backing rod set to depth so the sealant bonds two sides only, then the sealant the joint's movement and traffic call for.
Runs are handed back as they cure, with the lineal metres logged for your records — and any spalled edges flagged for concrete repair.
Scoped as failed runs only or a whole level — staged so the site keeps running.
The cheap reseal goes over the top of the old bead. Here's what doing it properly means for your project.

Slab-on-ground under three occupied levels, broken out and reinstated in A-B stages to the engineer's sequence. No residents relocated.

About 1,000 litres of carbonation repairs plus new crash barriers, staged so the carpark stayed open.

Stair soffit repaired with Sika MonoTop, formed and poured from above in an occupied building.
Most joints leak again because the last reseal went over the top of the old bead. Ours are cut out and done from clean concrete.
Send drawings, photos or just tell us where the joints are leaking.
Within the hourWe walk the joints, measure the failed runs and agree access and staging.
Quote within 7 daysA clear rate and quantity you can put straight into your program.
Fits your programRuns resealed and handed back in stages while the site keeps working.
Typical start ~2 weeks after awardWe'd rather tell you upfront than waste your time.

Joints are the scope most contractors rush — run a bead over the top, it looks fine on the day, and it's leaking again by the next wet season. We don't do that. Every failed run is cut out, cleaned back and resealed to suit the movement. Send us the project and we'll tell you straight what it needs.
Joint sealing is priced per lineal metre. These are our current rates, ex GST.
Cut out, clean back, prime, backing rod and reseal.
The smallest joint sealing project we take on, ex GST.
Run your quantities through our cost estimator, or send the spec for an itemised quote within 7 days.
Indicative only. Final price confirmed after a site look and the engineer's specification. Prices ex GST.
Tell us where the joints are and roughly how many metres. We'll come back within the hour with next steps, book a site measure and send an itemised quote within 7 days.
Old sealant out, joints cleaned back and primed, backing rod to depth and a sealant matched to the movement. Send us the project or call the crew.