Slabs, walls, hobs and plinths removed for Sydney head contractors, builders, remedial contractors and strata & asset managers. The concrete is scanned for reo, post-tension and services before a blade touches anything, the work is staged around your trades, and waste is priced up front. Quotes within 7 days.


Concrete demolition is the controlled removal of slabs, walls, hobs, plinths and other concrete elements. On a live or occupied site the concrete is scanned first to locate reinforcement, post-tension tendons and services, then cut, broken out and cleared to the engineer's markup, with the area left ready for the next trade.
It covers single hobs and plinths through to staged slab removal in occupied buildings, new openings for services, stairs and lifts, and breakouts ahead of a re-pour. The engineer decides what can come out and in what sequence; we scan, cut and remove to that plan.
If a section has to go, it gets scanned, cut cleanly and cleared, not hammered out and hoped for the best.
Hit an unmarked post-tension tendon, a live conduit or a main bar and the project stops. Scanning first costs a little. Not scanning can cost the program.
A cut tendon or main bar turns a removal into a structural repair, with the engineer redesigning around damage nobody planned for.
Live conduits and pipes in the slab get found with the blade: power out, water through the floor below and a claim to follow.
Every day the slab or wall is still in the way, the trades behind it wait. A scanned, staged removal keeps the sequence moving.
Scanned, set out to the engineer's markup, cut cleanly and cleared, so nothing in the concrete is a surprise.
Reinforcement, post-tension tendons and services are located and marked on the concrete before a saw or breaker starts, and checked against the engineer's markup. Scanning before cutting is part of every project.
Cut lines are set out around what the scan found, and propping goes in where the engineer specifies. Anything nearby that needs repair is picked up as concrete cancer repair work.
Saws with extraction cut the perimeter, the section is broken out and loaded out, and the edges are left sound. Cracks in what stays can be sealed with crack injection.
The area is cleaned up and left ready for the next trade, and where the section is going back we follow straight on with form, reo and pour.
Scanned before every cut, post-tension left alone, waste priced up front.
The cheap quote turns up with a breaker and starts. Here's the difference on your project.

Slab-on-ground under three occupied levels, broken out and reinstated in A-B stages to the engineer's sequence. No residents relocated.

Carpark topping slab and old membrane demolished, structure exposed for the engineer, then waterproofed and re-poured. Nine stages, one crew.

Drummy concrete broken out from underneath and core holes drilled through an occupied unit to pour the new section.
Most demolition goes wrong on the first cut: a tendon, a conduit or a main bar nobody located. We don't start until we know what's in the concrete.
Send the drawings, the engineer's markup or photos of what needs to come out.
Within the hourWe scan the concrete and confirm thickness, reinforcement, services and access on site.
Before we priceA price per m² or per element that you can carry into your program.
Quote within 7 daysCut, broken out and cleared around your trades, with the area left ready for the next one.
Typical start ~2 weeks after awardWe'd rather tell you upfront than waste your time. Here's who we're built for — and who we're not.

The expensive part of demolition is the thing nobody knew was in the concrete. So we scan before we cut, leave post-tension alone, and tell you straight when the engineer needs to look before anything comes out. Send the drawings and we'll tell you what it really takes.
Concrete demolition is priced per m² for slabs and per opening for penetrations. These are our current rates, ex GST.
Scan, cut, break out and load-out of slab and topping removal.
Per opening, scanned and cut to the engineer's markup. Minimum project $10,000.
Run your quantities through our cost estimator, or send the drawings for an itemised quote within 7 days.
Indicative only. Final price confirmed after a site look and the engineer's specification. Prices ex GST.
Send the drawings, the engineer's markup or photos. We come back within the hour with next steps, and send an itemised quote within 7 days.
Scanned before we cut, post-tension left alone, and the area left ready for the next trade. Send us the project or call — we respond within the hour.