Sydney building site — Aussie Concrete Repair
Home › Services › Floor Grinding & Levelling
Floor Grinding & Levelling · Sydney

We level floors. Ready for the next trade.

Slab grinding and self-levelling compounds for Sydney head contractors, builders, remedial contractors and strata & asset managers — high spots taken down, lows filled, and the floor handed over within the tolerance your finish calls for.

✓ NSW Licence 360636C✓ ACRA member✓ Grind and pour, one crew✓ 1-hour response
1 hr
Response time
7 days
Quote turnaround
2 wks
Typical start after award
ACRA ✓
Member
Get a quote
Send us the floor. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Start here

What is concrete floor levelling & grinding?

Concrete floor levelling brings an uneven slab back within the flatness tolerance the floor finish needs. High spots are ground down, the surface is prepared and primed, and a cementitious self-levelling or smoothing compound is poured to fill the lows — so tiles, vinyl, timber or coatings go down flat. Slabs come out of the pour with humps, dips, curl at the joints and the odd low spot around penetrations. Most floor finishes won't tolerate that — tiles lip, vinyl telegraphs every ridge, and timber rocks.

Levelling fixes the surface the finish sits on. It isn't a structural repair: if the slab is cracked, spalled or moving, that gets dealt with first, then the floor is brought back to line.

Grind vs pour — how we decide: grinding removes material, so it suits high spots, ridges and lips. A levelling compound adds material, so it suits dips and falls in the wrong direction. Most floors need a bit of both, and the survey tells us where.
Know the symptoms

6 signs a slab needs levelling before the finish goes down.

A straightedge and a laser level tell the story fast. These are the signs the floor is out of tolerance for what goes on it.

1
Humps and ridges at slab jointsCurled edges at construction and control joints stand proud of the surrounding slab.
2
Dips that hold waterLow spots that pond after cleaning or rain point to a surface that needs filling.
3
Lipping between tilesTiles on an uneven slab sit at different heights and catch feet and trolleys.
4
Vinyl showing every ridgeThin sheet and plank flooring telegraphs every bump and trowel mark underneath it.
5
Doors and fit-out that won't sit rightDoors that bind, joinery that rocks and shopfitting that needs packing usually mean the floor isn't flat.
6
A failed flatness checkThe flooring trade won't start, or the certifier or client flags the floor on inspection.
⚡ Flooring trade booked and the slab is out? Call — we respond within the hour.
Why it matters now

A floor that goes down on a bad slab comes back up as a defect.

Lay the finish on an out-of-tolerance slab and you're paying for it twice: once to install, and again to rip it up and fix the floor underneath.

01

Program risk

The flooring trade stands down when the slab fails their check. Every day it sits unlevelled is a day the trades behind them can't start.

02

Defects at handover

Lipping tiles, rocking timber and vinyl showing ridges end up on the defects list — and fixing them means lifting the finish.

03

Wasted finish

Flooring laid over a bad substrate fails early. Getting the slab right first protects the money spent on what goes on top.

Our approach

Survey it, grind it, pour it, check it.

We don't guess at a floor. We map it, take down what's high, fill what's low and check it against the tolerance before we hand it back.

1

Map the floor

A level survey marks the highs and lows across the area against the tolerance the finish needs, so the scope and the price are based on the real floor.

2

Prepare the slab

Grind down humps and lips, repair any damaged concrete (with patching where the slab is spalled), and remove contaminants so the compound bonds.

3

Prime and pour

Prime to the compound manufacturer's method, then pour and spread a cementitious self-levelling or smoothing compound to the depth the survey calls for.

4

Check and hand over

Check the finished floor against the tolerance and hand it over ready for the flooring trade — with joint sealing at movement joints where the spec calls for it.

What's covered

The floor grinding & levelling work we do.

From a single room to a whole floor plate — scoped on its own or alongside other concrete repairs on the same project.

Self-Levelling & Smoothing CompoundsCementitious compounds poured to fill dips and bring the surface back to line for the floor finish.Read more →
Slab Grinding & Lip RemovalHumps, ridges and curled joint edges ground down so the floor reads flat.Read more →
Surface Prep & PrimingContaminants and weak surface removed and the slab primed so the levelling compound bonds properly.Read more →
Patch & LevelDamaged areas repaired first, then the floor levelled in the same program.Repair first →
Falls & Fall CorrectionSlabs that fall the wrong way, or not enough, re-profiled where the spec allows.Get a quote →
Old Finish Removal & PrepOld adhesive, tile bed and coatings taken off so the new floor starts on clean concrete.Read more →
Why Aussie Concrete Repair

Why our floors pass the flatness check.

The cheap quote skims a bag of compound over the low spots and leaves. Here's what a measured floor means for your project.

What matters
Aussie Concrete Repair
Typical contractor
Before we start
✓ Floor surveyed against the tolerance
× Eyeballed with a straightedge
High spots
✓ Ground down, not buried
× Compound poured over the top
Bond
✓ Slab prepared and primed to method
× Poured onto dust and residue
Program
✓ Staged around your trades
× On their schedule, not yours
Handover
✓ Checked before the flooring trade arrives
× Found out when the tiler does
Our work

Recent work, with the numbers.

Slab repair after magnesite removal, Elamang Ave, KirribilliSlab repair

Elamang Ave — Kirribilli

Mass cracking and drummy concrete found under magnesite, repaired with the structural engineer and left ready for the new floor finish.

$150KValue
10 wksDuration
StrataClient
View project →
Carpark topping slab replacement, McElhone St, WoolloomoolooCarbonation repair

Birrell St — Tamarama

About 1,000 litres of carbonation repairs plus new crash barriers, staged so the carpark stayed open.

$100KValue
3 mthsDuration
StrataClient
View project →
Structural slab reinstated under occupied levels, Pacific Hwy, KillaraSoffit repair

Laycock Ave — Cronulla

Stair soffit repaired with Sika MonoTop, formed and poured from above in an occupied building.

$45KValue
4 wksDuration
RemedialClient
View project →
Risk reversal

Measured before and after. Check our credentials.

Most levelling fails because nobody measured the floor, or the compound went down on a dusty, unprimed slab. We don't skip either.

✓
Surveyed before we priceThe floor is mapped against the tolerance for the finish, so the price reflects the real highs and lows.
✓
NSW Licence 360636C · ACRA memberVerify our licence on the NSW Fair Trading register before you call. We'd rather you check.
✓
Installed to the manufacturer's methodPrep, priming, mixing and depths follow the compound manufacturer's instructions — not shortcuts.
✓
Checked before handoverThe finished floor is checked against the tolerance before the flooring trade is booked in.
We'd rather you check than take our word for it.
What happens after you send the project

From first call to a fixed price — floor surveyed first.

1
You send the project

Send the area, the finish going down and any flatness spec or survey you have.

Within the hour
2
Floor survey

We map the highs and lows and check the slab condition on site.

Before we price
3
Fixed price

A price per m² for grinding and levelling that you can carry into your program.

Quote within 7 days
4
Grind and pour

Floor ground, primed and levelled around your trades, then checked and handed back.

Start about 2 weeks after award
Is this you?

We're a fit for some projects, not all.

We'd rather say so on the first call than waste your time.

This is for you if…

  • You're a head contractor, builder, remedial contractor or flooring trade working in Sydney.
  • You have a slab that needs to be within tolerance before the finish goes down.
  • You want high spots ground, not buried under compound.
  • You need the floor checked and handed over ready for the next trade.
  • You need the work staged around other trades.

Probably not us if…

  • It's a small DIY patch you can do with a bag from the hardware store.
  • The slab is structurally damaged and nobody has looked at why.
  • You want compound poured with no survey or prep.
  • You need work outside Sydney.
Aussie Concrete Repair on a Sydney site
Who you're dealing with

You'll deal with the crew lead, not a call centre.

A floor finish is only as flat as what's under it. We survey the slab, take down the highs, fill the lows to the manufacturer's method and check it before we leave — so your flooring trade starts on time and the floor doesn't come back on the defects list. Send the area and the finish, and we'll tell you what it takes.

— Ben Tran, Founder, Atomic ProjectsNSW Licence 360636C · ACRA member
Straight answers on price

What floor grinding & levelling costs in Sydney.

Floor levelling and grinding is priced per square metre. These are our current rates, ex GST.

Rate
$150–$300 / m²

Grinding and levelling compound, priced by area.

Minimum project
$10,000

The smallest floor project we take on, ex GST.

Your exact number
Free estimate

Run your quantities through our cost estimator, or send the spec for an itemised quote within 7 days.

Indicative only. Final price confirmed after a site look and the engineer's specification. Prices ex GST.

Send us the floor.

Send the area, the finish going down and any spec you have. We come back within the hour with next steps, and send an itemised quote within 7 days.

Get a quote
Send us the floor. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Common questions

What head contractors ask about floor levelling.

What tolerance will you level the floor to?+
To the tolerance your flooring manufacturer, specification or engineer calls for — the finish decides it, not us. Send the spec with the project and we survey the slab against it before we price. The tolerance is set by the spec and the flooring trade, and confirmed in the quote.
Should the slab be ground or levelled with compound?+
Often both. Grinding takes down high spots, ridges and curled joint edges; a levelling compound fills the lows. Where the slab is damaged before it's out of level, that's concrete patching, and we scope both in the same visit.
Do you do moisture testing before the flooring goes down?+
Moisture limits for the finish are set by the flooring manufacturer and your spec, and the readings are normally the flooring trade's call. We'll tell you if the slab looks wet when we survey it, and the compound goes down to its own manufacturer's method.
How soon can the flooring trade get on it?+
It depends on the compound, its depth and site conditions. Light foot traffic is usually possible well before floor coverings can go down — cure times are set by the product and the flooring trade's requirements, and confirmed in the quote so you can sequence the next trade.
How deep can you pour a levelling compound?+
It depends on the product — smoothing compounds go down thin, self-levelling compounds handle more depth, and deeper fills may need a different system. The survey tells us the depth, we choose the compound to suit, and the depths are confirmed in the quote.
Can you work on a live or occupied site?+
Yes. Levelling is staged around the program so it can happen when the floor isn't in use. Grinding is done with dust extraction, and the area is closed off until the compound has cured enough to walk on.

Survey it. Grind it. Level it.

The floor mapped first, high spots ground, lows filled to the manufacturer's method, and the floor checked before your flooring trade arrives. Send us the project or call — we respond within the hour.

Get a quote →
or call 0410 515 509
No obligation. We respond within the hour.
📞Get a quote →
Call NowGet a quote →