For Strata & Asset Managers · Sydney

Concrete repairs that keep the building running.

Concrete cancer, crack injection, joint sealing, coatings and structural concrete repairs for strata managers, building managers and asset managers across Sydney — built to the engineer's report, staged around residents and tenants, and documented for the building file.

Strata, commercial & mixed-use buildings · Quotes within 7 days

No obligation. We respond within the hour.

100 +
Buildings
$20M +
Delivered across team careers
15 +
Years experience
1 hr
Response, every enquiry
Get a quote
Tell us about the building. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
How we work with you

A concrete contractor that works around your building, not the other way round.

The concrete repairs that hurt a strata or asset manager are the ones that disrupt residents or tenants, blow the budget halfway through and leave a thin record behind. That's where the real cost lands — not just in the contract.

So we set up to avoid all of that: a clear quote against the engineer's report within 7 days, works staged around the people in the building, and a repair register for the building file and your insurer.

Get a quote →
1

We work around the building

Staged or zoned so residents stay in place and tenants keep trading — works planned around access and hours, not dropped on top of them.

2

One crew, one point of contact

Concrete cancer, crack injection, joint sealing, coatings and demolition under one contractor — not three trades to coordinate.

3

We manage safety and access

Exclusion zones, noise, dust and notices handled around residents and tenants — so there's no complaint storm and no WHS incident to write up.

4

We document for the building file

A repair register — every location numbered, measured and photographed — plus the records your engineer, committee and insurer will want.

The delivery map

Where concrete repairs catch a strata or asset manager — and where we take the load.

A concrete repair project lands back on the manager at four points — the quote, the people in the building, delivery, and the record afterwards. Here's the trap at each step, and how we handle it.

1Quote & budget

Comparing like with like.

⚠ The trap

Quotes that don't follow the engineer's report can't be compared, and the real number only shows up once the concrete is opened up.

✓ How we set it up

An itemised quote against the engineer's report within 7 days, priced per location.

2Residents & tenants

Keeping the building livable.

⚠ The trap

Works that shut access or cause noise without notice trigger complaints — and the fallout lands with you, not the contractor.

✓ How we set it up

Staged, zoned and notified so people stay in place.

3Delivery

Working in an occupied building.

⚠ The trap

A contractor who needs the building empty can't deliver in a live building — so the works stall or residents have to move.

✓ How we set it up

We work in occupied buildings as standard — that's our normal.

4Building record

Documenting for the file & insurer.

⚠ The trap

Thin records mean the next engineer, audit or insurer can't see what was done — and the exposure sits with the owners.

✓ How we set it up

A repair register handed over for the building file.

⚡ Concrete dropping over a walkway or common area? Call 0410 515 509 — 1-hour response.
Why a bad pick costs you

The wrong contractor doesn't just risk the works — it risks your building.

In an occupied building the contractor's habits land on the residents, the tenants, the budget and the record. The wrong pick doesn't just risk the repair — it risks your relationship with the owners.

01

Disruption becomes complaints

Works that stop access or run noisy without notice become complaints to you. The cheap contractor who needs the building empty turns out to be the expensive one.

02

Patches cost more than repairs

Concrete cancer skimmed over comes back, usually bigger. A repair that reaches the steel and is logged location by location costs less over the life of the building.

03

Thin records become your problem

With no record of what was done where, the next engineer, audit or insurer can't verify the repair — and the exposure stays with the building.

⚡ Concrete dropping over a walkway or common area? Call 0410 515 509 — 1-hour response.
Our work

Delivered. Documented. Residents kept in place.

Concrete repairs we've delivered for owners corporations and strata managers, staged so residents stayed in place and carparks stayed open.

Carbonation concrete repair, Birrell St, TamaramaCarbonation repair

Birrell St — Tamarama

About 1,000 litres of carbonation repairs plus new crash barriers, staged so the carpark stayed open.

$100KValue
3 mthsDuration
StrataClient
View project →
Slab repair after magnesite removal, Elamang Ave, KirribilliSpalling repair

Elamang Ave — Kirribilli

Mass cracking and drummy concrete found under magnesite, repaired as one package with the structural engineer.

$150KValue
10 wksDuration
StrataClient
View project →
Concrete spalling repair, Coolong Rd, VaucluseSpalling repair

Coolong Rd — Vaucluse

Honeycombed pour and corroding reinforcement broken back, treated, rebuilt and coated.

$50KValue
2 wksDuration
Owners CorpClient
View project →
Why FMs keep us on the panel

Aussie Concrete Repair vs a contractor who needs the building empty.

Two contractors can win the same project and run completely differently in an occupied building. Here's the gap that shows up for your residents and tenants — and in what you report to the owners.

In an occupied building
A contractor who needs it empty
Aussie Concrete Repair
Residents & tenants
✕Moved out or disrupted
✓Stay in place — staged works
Notice
✕Works start without warning
✓Notified before works start
The price
✕Moves once it's opened up
✓Itemised per location, quoted in 7 days
Contact
✕You chase several trades
✓One crew, one point of contact
Records
✕Nothing for the file
✓Repair register for the file
For the building file

The records your engineer, committee and insurer will want — and what to send us.

When the next engineer, audit or insurer asks what was done to the building, you need a record that answers it. We hand the work over already in that shape.

What's in the handover

Compiled as the works run and handed over complete — so your building file is updated by us, not rebuilt by you.

✓

Progress vs program — where we are against the dates, with any risk flagged.

✓

Dated photos by location — before, during and after, every repair numbered.

✓

QA & hold-point records — hold points signed off by the engineer.

✓

Repair register — locations, sizes, depths and materials used.

✓

Warranties — workmanship and manufacturer, collated for the file.

✓

A close-out record — a complete record for the building file.

What to send us

The more of this you have, the faster we can scope or price the work. Don't have it all? The defect and the building are enough to start.

✓

The engineer's report or defect list — if one's been issued.

✓

The building address & access details — who's living or trading where.

✓

Access constraints — when works can and can't happen.

✓

Your insurer or committee requirements — anything the records have to satisfy.

✓

Budget or approval timing — so we can fit the works to your plan.

Straight answers on price

What concrete repairs cost — for your budget.

Concrete repairs are priced per location, depending on size, depth and access. Typical projects run from $20,000 to $500,000 — send the engineer's report and we'll give you an itemised quote within 7 days.

Small call-outs
From $7,500

A single repair, crack run or joint — one crew, one visit.

Single-service packages
From $10,000

One service across a balcony stack, carpark or building — e.g. a full crack-injection or joint-sealing scope.

Full remedial packages
$20k–$500k

Repair, form-and-pour, joints and coatings across the building in one staged program.

Every scope is transparent and fixed off a confirmed cause — no mystery line items, no “we'll see when we open it up” that turns into an emergency variation you have to explain to ownership.

Risk reversal

The work is documented and warrantied in writing. Verify everything.

Most concrete repairs come back because the last contractor patched over the rust instead of treating it. We don't.

✓
Written 10-year warrantyA defined 10-year term, in writing — not the vague "warranty provided" everyone else offers.
✓
Class 2 DBP registered — Licence 360636CVerify us on the NSW Fair Trading register before you call. We'd rather you check.
✓
Engineer-directed & documentedA repair register your engineer, committee and insurer can audit at any stage.
✓
Built to the engineer's reportWe repair to the engineer's specification and flag anything on site that doesn't match it.

We'd rather you check than take our word for it.

What happens after you get in touch

From first call to signed-off repairs — no mystery.

1
You get in touchSend the engineer's report or describe the problem — and your access constraints.Within 1 hour
2
Site lookWe check the extent, access and who's in the building.Within days
3
Itemised quote & programA per-location quote and a program staged around the building.Within 7 days
4
Repair & recordsWorks staged around residents and tenants, with the repair register handed over on completion.Start ~2 wks after award
Is this you?

We're a fit for some buildings, not all.

This is for you if…

  • ✓You manage a strata, commercial or mixed-use building with concrete repairs to do.
  • ✓You need works staged around residents or tenants — not a building that has to empty.
  • ✓You have an engineer's report, or need the extent confirmed before you budget.
  • ✓You need a record of the repairs for the building file, the committee or your insurer.
  • ✓You want an itemised quote within 7 days and a start about 2 weeks after award.

Probably not us if…

  • —It's a single house or a driveway — a local trade is a better fit.
  • —You want the cheapest skim over the cracks and will wear it when it comes back.
  • —There's no engineer involved and it's a structural question — get the engineer in first; we'll build to their spec.
  • —You need it done today with no scoping — we confirm the extent before we quote.
“
They worked around our trading hours — not one tenant lost a day, and the asset file came back complete.
FM
Facilities Manager
Sydney
Aussie Concrete Repair crew lead on a Sydney site
Who you're dealing with

You'll deal with the crew boss, not a call centre.

Too many contractors treat an occupied building like an empty site — and the strata or asset manager wears the complaints. We stage the work around the people in the building, quote it properly and hand over a record you can file.

— Ben Tran, Founder, Atomic ProjectsClass 2 DBP registered · NSW Licence 360636C · ACRA member
Common questions

What strata and asset managers want to know.

Can you work without moving residents or closing tenancies?+
Yes — that's our normal. We stage and zone the works so residents stay in place and tenants keep trading, with access, noise and dust planned around the building.
How do you handle staged works in an occupied building?+
We plan the sequence around access and hours, zone the work areas, and give notice before noisy works or access changes, so the rest of the building runs as normal.
What records do we get for the building file?+
A repair register: every location numbered, measured and photographed before, during and after, with the materials used and the engineer's hold-point sign-offs. It's the record your next engineer, audit or insurer will ask for.
Can you quote from our engineer's report?+
Yes. Send the report and we'll give you an itemised, per-location quote within 7 days. No report yet? Send photos for an indicative range and we'll confirm the extent on site.
How soon can you start?+
Typically within 2 weeks of award, depending on scope and access. We confirm the start date with the quote.
Are you licensed and registered?+
Yes — Class 2 DBP registered, NSW contractor licence 360636C and an ACRA member, verifiable on the NSW Fair Trading register. Aussie Concrete Repair is a trading name of Neobuilt Pty Ltd (ABN 53 627 550 323).
How do concrete repairs fit into a maintenance plan?+
Safety-critical defects first, then the locations degrading fastest, staged to fit the budget and the building. A per-location quote makes it easy to split the work across budget periods.
How much notice do residents and tenants get?+
A notice of works goes out before we start, covering scope, program, working hours and site contacts, with further notice before noisy works or access changes.
How much do concrete repairs cost?+
It depends on the number of locations, depth and access. Typical projects run from $20,000 to $500,000; send the engineer's report for an itemised quote within 7 days.
Who manages site safety and inductions during the works?+
We do. Site-specific inductions, pre-starts, hazard reporting and exclusion zones around drop areas are run by our crew for the duration of the works.
What happens if more damage is found once the concrete is opened up?+
You see the evidence before an invoice. Every extra location is measured, photographed and priced before we carry on, so any variation is backed by the record.
Get a quote

Send us the engineer's report.

Send the report, photos or just the problem. We call back within the hour and quote within 7 days.

Get a quote
Tell us about the building. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Call NowGet a quote →