Sydney concrete structure — Aussie Concrete Repair
Home › Services › Carbon Fibre & FRP Strengthening
Carbon Fibre & FRP Strengthening · Sydney

We strengthen slabs, beams and columns. To the engineer's design.

Carbon fibre laminates and wraps bonded to existing concrete for Sydney head contractors, builders, remedial contractors and strata & asset managers — new penetrations, load upgrades and capacity lost to corrosion. Installed to the engineer's design. Quotes within 7 days.

✓ NSW Licence 360636C✓ ACRA member✓ Engineer-designed✓ Quotes within 7 days
1 hr
Response time
7 days
Quote turnaround
2 wks
Typical start after award
ACRA ✓
Member
Get a quote
Send the strengthening drawings. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Start here

What is carbon fibre strengthening?

Carbon fibre (CFRP) strengthening adds capacity to concrete that's already built. Thin carbon fibre laminates or fabric are bonded to a slab soffit, beam or column with structural epoxy. The fibre carries tension, the epoxy transfers it into the concrete, and the element can take load it wasn't designed for.

The structural engineer designs the system; we prepare the substrate, install it to the manufacturer's method and hand over the test and install records. Where the concrete itself is spalled or corroded, it has to be repaired back to sound concrete first — handled on our concrete cancer repair page, and sequenced in the same project.

Strip or wrap — the format that changes the scope: laminate strips are factory-cured plates bonded to soffits and beam faces for bending capacity. Fabric wraps are saturated on site and wrapped around columns or shaped over beams for confinement and shear. The engineer's design nominates which, how many layers and how it's anchored.
When it gets specified

6 reasons an engineer calls up carbon fibre.

CFRP usually lands in your program for one of these reasons. If one sounds like your project, send us the drawings before you lock the program.

1
New penetrations through a slabCutting for services, stairs or lifts severs reinforcement — laminates around the opening restore the load path.
2
Change of useA floor becoming plant, storage or a gym needs more live-load capacity than it was designed for.
3
Heavier loads on a car park or roofNew plant, vehicles or equipment above what the slab was built to carry.
4
Capacity lost to concrete cancerWhere corrosion has eaten reinforcement past what patching restores, fibre goes over the repaired zone.
5
Design or construction shortfallsMissing or misplaced reo, or under-strength concrete found during an investigation.
6
Column confinementFabric wrapped around columns to confine the concrete and add ductility or axial capacity.
⚡ Strengthening detail holding up your program? Call — we respond within the hour.
Why it matters now

Strengthening is a hold point, not a finishing trade.

Leave it late and it sits on your critical path. Prep, testing and cure windows all need to be in the program before the trades behind it can start.

01

Hold points stall

The engineer won't release the element until prep records, pull-off results and install records are in hand. Missing paperwork stops the project as surely as missing fibre.

02

Cure sets the loading date

Epoxy cure depends on temperature and the system. Plan the window up front and loading happens on time; discover it late and the next trade waits.

03

Fire protection & follow-on trades

Where the element needs a fire rating, a protective board or coating goes over the fibre. It's the item most often missed in the program.

Our approach

Prepared right, bonded once, recorded throughout.

The fibre is the quick part. The result depends on the substrate under it and the records that go with it — so that's where we spend the effort.

1

Start from the engineer's design

We price and install from the engineer's strengthening design. Where cracks need injecting first, or the design isn't final, we flag it before we price.

2

Repair and prepare the substrate

Defective concrete is repaired back to sound material, then the surface is ground or blasted to the profile the system requires.

3

Bond to the design

Laminates or fabric are bonded with structural epoxy to the layout, layers and anchorage on the drawings, to the manufacturer's method. Spalled areas are repaired first under our concrete cancer repair scope.

4

Test and record every hold point

Pull-off tests where specified, batch records and installation ITPs, packaged so the engineer can release the hold point. Talk to us about what your engineer will need.

What's covered

The carbon fibre work we install.

Each scoped on its own or alongside the concrete repair, crack injection and demolition work it usually comes with.

Slab Soffit StrengtheningLaminate strips bonded under slabs to add bending capacity for new loads or lost reinforcement.Read more →
Openings & PenetrationsStrengthening around new slab openings and penetrations so the load path still works.Read more →
Beam & Shear StrengtheningLaminates and U-wraps on beams for flexural and shear capacity, to the engineer's layout.Read more →
Column & Pier WrappingFabric wraps for confinement, ductility and axial capacity on columns and piers.Read more →
Wall & Transfer ElementsWalls, transfer slabs and other elements where the engineer specifies externally bonded fibre.Get a quote →
Substrate TestingPull-off testing of the prepared surface and cured system where specified, with results recorded for sign-off.Read more →
Why Aussie Concrete Repair

Why our strengthening holds.

The cheap quote bonds fibre to whatever surface is there. Here's what doing it properly means on your project.

What matters
Aussie Concrete Repair
Typical contractor
Design
✓ Installed to the engineer's design
× Substitutes products or details
Substrate
✓ Repaired and prepared to spec first
× Bonded over defective concrete
Testing
✓ Pull-off tests where specified
× Nothing to show the engineer
Program
✓ Cure and loading dates up front
× Finds the cure window late
Sign-off
✓ Records pack for the hold point
× No install records
Our work

Recent work, with the numbers.

Stair strengthening in place, Lamrock Ave, Bondi BeachStrengthening

Lamrock Ave — Bondi Beach

Failing stairs kept by pouring a new structure underneath in two propped stages. No new landings, no car spaces lost.

$150KValue
3 mthsDuration
EngineerClient
View project →
Epoxy injection ports on a strengthened slab, Fitzwilliam St, VaucluseForm, reo & pour

Fitzwilliam St — Vaucluse

A slab past patching, rebuilt from underneath through core holes in an occupied unit. Galvanic anodes, cold joint injected.

$110KValue
10 wksDuration
EngineerClient
View project →
Structural slab reinstated under occupied levels, Pacific Hwy, KillaraForm, reo & pour

Pacific Hwy — Killara

Slab-on-ground under three occupied levels, broken out and reinstated in A-B stages to the engineer's sequence. No residents relocated.

$250KValue
16 wksDuration
Owners CorpClient
View project →
Risk reversal

Engineer's design. Check our credentials.

Strengthening is no place for a contractor who improvises. We install what the engineer designed, test what's specified and record all of it.

✓
Installed to the engineer's designNo substituted products or details without the engineer's written sign-off.
✓
NSW Licence 360636C · ACRA memberVerify our licence on the NSW Fair Trading register before you call. We'd rather you check.
✓
Records for every hold pointPrep, test, batch and install records packaged for the engineer and your handover file.
✓
Straight about the substrateIf the concrete isn't sound enough to bond to, we tell you before the fibre goes on — not after it fails a test.
Check us first — we'd rather you did.
What happens after you send the drawings

From drawings to a fixed price — no mystery.

1
You send the drawings

Send the engineer's strengthening design, the defect report or photos.

Within the hour
2
Site check

We confirm substrate condition, access and any repair needed before the fibre.

Quote within 7 days
3
Fixed price

A price with prep, testing and cure windows set out for your program.

Fixed before we start
4
Install & records

Repaired, prepared, bonded and tested — with the records pack at the end.

Typical start ~2 weeks after award
Is this you?

We're a fit for some projects, not all.

Better to say so now than after a site visit.

This is for you if…

  • You're a head contractor, builder, remedial contractor or strata & asset manager with a strengthening detail on the drawings.
  • A slab, beam, column or opening needs carbon fibre to the engineer's design.
  • The site is live or occupied and the work has to fit around other trades.
  • You need test and install records for the hold point and handover.
  • You want the concrete repair and the strengthening in one subcontract.

Probably not us if…

  • There's no engineer involved and no strengthening design.
  • You want fibre bonded over defective concrete to save the repair.
  • You need the strengthening designed — that's your structural engineer's role.
  • You need work outside Sydney.
Aussie Concrete Repair on a Sydney site
Who you're dealing with

You'll deal with the crew lead, not a call centre.

Carbon fibre is only as good as the concrete it's bonded to and the records that prove it. So we repair and prepare the substrate properly, install exactly what the engineer designed, and tell you straight when something on site doesn't match the drawings. Send the design and we'll tell you what it really takes.

— Ben Tran, Founder, Atomic ProjectsNSW Licence 360636C · ACRA member
Straight answers on price

What carbon fibre strengthening costs.

Carbon fibre strengthening is priced per square metre of CFRP installed. These are our current rates, ex GST.

Rate
$1,000–$1,500 / m²

Per m² of CFRP installed. Excludes the engineer's design.

Minimum project
$15,000

The smallest strengthening project we take on, ex GST.

Your exact number
Free estimate

Run your quantities through our cost estimator, or send the spec for an itemised quote within 7 days.

Indicative only. Final price confirmed after a site look and the engineer's specification. Prices ex GST.

Send us the drawings.

Send the strengthening design, defect report or photos. We come back within the hour with next steps, and send an itemised quote within 7 days.

Get a quote
Send us the project. We respond within the hour.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
We respond within the hour. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Common questions

What head contractors ask about carbon fibre strengthening.

Who designs the strengthening — you or the engineer?+
The structural engineer. They set the fibre type, layers, orientation, anchorage and any fire protection, and we install exactly that to the system manufacturer's method. If the concrete needs repair first, that's our concrete cancer repair work, sequenced ahead of the fibre.
Why carbon fibre instead of steel plates or new beams?+
Mostly weight and headroom — a laminate is millimetres thick and needs no hot works or heavy lifting. Cracks in the element are injected first, and the engineer decides whether CFRP, steel or another method suits the element.
What surface preparation and testing is involved?+
Preparation is most of the work. The concrete is ground or blasted back to sound aggregate, defects are repaired, and where the design calls for it the prepared surface and the cured system are pull-off tested. Those results, with batch and install records, go to the engineer.
How long before the element can take load?+
The install itself is usually quick; cure time sets the pace. Epoxy cure depends on temperature and the system used, so the loading date comes from the manufacturer's data and the engineer — we give you that window with the price so it goes straight into your program.
Does carbon fibre need fire protection?+
Sometimes. Epoxy softens at relatively low temperatures, so where the strengthened element needs a fire rating, the engineer or fire engineer specifies a protective board or coating over the fibre. We flag it at pricing so that trade isn't missed — we don't self-certify fire performance.
Can you work in an occupied building or around other trades?+
Yes. Grinding is the noisy, dusty part and goes to the hours your site allows, with extraction running. Bonding the fibre is quiet with no hot works, so it sits comfortably alongside other trades.

Strengthening on your drawings? Get it priced.

Installed to the engineer's design, on sound concrete, with the records to release the hold point. Send the drawings or call — we respond within the hour.

Get a quote →
or call 0410 515 509
No obligation. We respond within the hour.
📞Get a quote →
Call NowGet a quote →