We build exactly what you specify, respect every hold point, and raise site discrepancies before we proceed — never improvise. Every repair location is numbered, measured and photographed, then handed back for your sign-off.
Every enquiry answered within 1 hour.


A good specification can still end in a bad repair. It happens when the contractor skips a hold point, substitutes a product, guesses when site conditions differ from the report, or hands back nothing you can sign off against.
So we work the other way: we build to the spec, call you in at every hold point, measure and photograph anything that doesn't match the report and issue it to you before we proceed, and hand back a full repair register. You stay in control of the design. We do the building.
Get a quote →Your specification, your products, your details, your hold points. We don't substitute, redesign or skip ahead — if something needs to change, it's your call.
Concrete cancer and spalling repair, form, reo and pour, crack injection, carbon fibre to your design, joint sealing, coatings, levelling and demolition — one contractor and one point of contact for your client.
When site conditions differ from the report, we stop, measure and photograph it, and issue it to you before proceeding — so the decision is yours, made on evidence.
A repair register: every location numbered, measured and photographed before, during and after, with materials and batch records — handed over for your sign-off.
It's rarely the design. A specified repair trips up at four points — scoping, breaking out, inspection and close-out. Here's the trap at each stage, and how we're set up so it doesn't land on you.
A lump-sum number that doesn't follow your scope — so the client can't compare quotes and the gaps turn up as variations later.
An itemised quote to your spec within 7 days — line by line, so you and your client can compare like-for-like.
A contractor who cuts without scanning — and hits reo, a conduit or a post-tensioned tendon in a slab you're responsible for.
We scan for reo, conduits and post-tensioning before every cut or break-out.
Reo treated and closed up before you've seen it, or a different condition found and quietly 'fixed' without telling you.
Reo and steel left open for your inspection where specified, and site discrepancies measured, photographed and issued to you before we proceed.
No record of what was repaired, where, or with what — so you're asked to sign off work you can't verify.
A repair register handed over: every location numbered, measured and photographed, with materials and batch records.
Your name is on the specification. If the contractor builds something different, the client remembers whose report it was — not who held the grinder.
A skipped hold point or a substituted product means a repair you can't stand behind — and a call from the client when it fails.
Site conditions that differ from the report, 'fixed' on the spot without telling you, leave you certifying work you never saw.
No register, no photos, no batch records — and nothing to show the client what was repaired, where and how.
Whatever your specification calls for — patch repair, injection, carbon fibre, coatings or rebuild — installed to the design, with the records you need to sign it off.
Three engineer-designed repairs we built to specification: staged, propped, injected and signed off at every hold point.

Failing stairs kept by pouring a new structure underneath in two propped stages. No new landings, no car spaces lost.

A slab past patching, rebuilt from underneath through core holes in an occupied unit. Galvanic anodes, cold joint injected.

Slab-on-ground under three occupied levels, broken out and reinstated in A-B stages to the engineer's sequence. No residents relocated.
Two contractors can price the same specification and deliver very different repairs. Here's the gap that shows up when you come to sign off.
Signing off a repair you didn't watch is hard without evidence. We hand ours over with the work. Here's what's in it, and what we need from you to price the project.
Handed over for your sign-off — ready to go into your report to the client.
Repair register — every location numbered and measured.
Photos at every stage — before, during and after, for each location.
Scan & hold-point records — scan results before every cut, hold points recorded.
Site discrepancy notices — anything that differs from the report, measured and photographed.
Materials record — the products used, matched to your spec.
Batch & quantity records — what went in, where, and how much.
The more of this you have, the faster we can price. Don't have it all? The report and the scope are enough to start.
Your specification or report — or the scope of works, if that's all there is.
Drawings and details — repair details, mark-ups and product schedules.
Hold points — what you want to inspect, and when.
Access & occupancy — who's in the building and when we can work.
Quantities or a schedule — if you have one, so we price like-for-like.
Costs depend on the scope, access, quantities and your spec. We price line-by-line to your report so your client can compare like-for-like — the price is confirmed before any work starts.
Concrete repair, spalling and crack injection — priced per m², per lm or per location.
Formwork, reo and repair pours, plus scanning, saw cutting, break-out and removal — priced per m³, per m² or per lm.
Carbon fibre strengthening to your design, protective coatings and joint sealing — priced to the spec.
Every line is priced to your specification — no mystery items, and no “we'll see when we open it up” that your client has to come back to you about.
You're putting your name next to ours when you recommend a contractor. Here's what you can verify first.
We'd rather you check than take our word for it.

Concrete repair is all we do. Send us your spec and we'll tell you straight what it takes, what we need confirmed and when we can start — then we scan first, build to the spec and hand you the records.
Send the report, the spec or the drawings. Every enquiry answered within 1 hour.