Wall and facade movement joint sealing reseals the vertical joints between panels and elements. The failed bead is cut out, the joint faces are cleaned back and primed, a backing rod is set to depth so the sealant bonds two sides only, and a sealant matched to the movement and exposure goes in.

A bead torn through the centre couldn't take the movement. One peeled off one side wasn't cleaned or primed, or was stuck to the back of the joint as well as the sides. Old sealant goes brittle with UV and falls out. Sealing over the top of a failed bead doesn't fix any of these.
Movement, traffic and exposure decide the sealant — not whatever is in the van. Where the spec names a product, we use it.
A 10-year written warranty.
Part of concrete joint sealing. See also carpark and expansion joints, podium and balcony joints, slab construction joints, hob and upstand joints. Spalled joint edges are rebuilt under concrete repair; cracks running off a joint go to crack injection.
Tell us where the joints are and roughly how many metres — we call back within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.