Anti-carbonation and protective coating systems applied after repair — so new corrosion doesn't start beside the patch. Surface prep to the system's spec, batch records in the register.


Protective coatings slow down the processes that cause concrete cancer, mainly carbonation and chloride ingress. They are applied after repairs to protect the whole surface, so new corrosion doesn't start next to the patched areas. Repair fixes the concrete that has already failed. A coating protects the concrete that hasn't failed yet — the sound surface around every patch, where carbonation and chlorides are still working their way toward the steel.
We apply the coating as the last stage of the repair package: surface prep to the manufacturer's specification, primer, then the system at the specified film build — with batch numbers and areas logged in the repair register so the engineer can sign it off.
Concrete tells you it's losing its protection long before it spalls. If you can see any of these, carbonation or water is already working toward the steel.
Repairing spalls without protecting the surface around them is how a one-off repair becomes a recurring line item on the program.
Patches fix the failed spots, but the untreated concrete next to them keeps carbonating. Without a coating, the next spalls start right beside the last repairs.
Coming back to a finished building means re-access and re-mobilising — every return trip costs more than the coating would have.
The engineer's spec often calls for a protective system after repair. Leave it off and the repair package isn't complete.
A coating is only as good as the surface under it. We repair first, prep to the system's spec and apply the coating last — logged area by area.
We start from the engineer's specification and the repair scope — the coating system, film build and surface prep are confirmed before a price is quoted, so the scope matches the spec.
Spalls broken out and reinstated, cracks dealt with by crack injection and failed joints by joint sealing — the coating goes over sound concrete, not over defects.
Grind or blast the surface to the profile the system needs, blend the patch repairs and remove any failed toppings or coatings. Prep is where most coating failures start, so we don't rush it.
Primer and protective system applied to the specified film build, with batch numbers and areas logged in the repair register your engineer signs off.
Protection matched to the exposure and the engineer's spec — on its own or as the final stage of a repair package.
The cheap quote rolls paint over the patches and leaves. Here's what protecting concrete properly means for your program.

Honeycombed pour and corroding reinforcement broken back, treated, rebuilt and coated.

Stair soffit repaired with Sika MonoTop, formed and poured from above in an occupied building.

About 1,000 litres of carbonation repairs plus new crash barriers, staged so the carpark stayed open.
Most coatings fail because the surface under them was never repaired or prepped. We repair it, prep it, coat it and record it.
Send the engineer's spec or repair scope, or describe the surface and what's failing.
Within the hourWe look at the substrate, the exposure and the access to confirm the prep and the system.
Days, not weeksA documented scope, priced per m², your engineer can check.
Quote within 7 daysPrepped, coated and recorded area by area, around the other trades.
Start about 2 weeks after awardWe'd rather tell you upfront than waste your program time.

Coating is the easiest thing to quote cheap and the easiest to get wrong. We finish the repairs, prep to the system's spec and coat last, so the protection works. Send me the spec and I'll tell you straight what it takes.
Protective coatings are priced per square metre. These are our current rates, ex GST.
Per m² of coated surface, to the specified system.
The smallest coatings project we take on, ex GST.
Run your quantities through our cost estimator, or send the spec for an itemised quote within 7 days.
Indicative only. Final price confirmed after a site look and the engineer's specification. Prices ex GST.
Send the spec or photos and we'll confirm the system, the prep and a fixed price per m². We call back within the hour and send an itemised quote within 7 days.
Repairs finished first, surface prepped to spec, coated last and recorded in the register. Call 0410 515 509 or send us the project.