Podium and balcony joint sealing reseals movement joints that sit over occupied space below. Failed sealant is cut out, the joint is cleaned back to sound concrete and primed, a backing rod is set to depth and a new sealant goes in, so water stops reaching the level below and the reo either side.

A failed joint over retail, a carpark or a plant room leaks onto stock, cars and services — and the call goes to the builder. Joints that leak at inspection or in the first rain hold up handover and come back as defects.
Usually the old bead wasn't cut out, the joint faces weren't cleaned and primed, or there was no backing rod so the sealant stuck to the bottom of the joint and tore when the slab moved. We fix the cause, not just the bead.
Cracks running off a joint aren't buried under new sealant. They're mapped and treated separately, usually with crack injection.
A 10-year written warranty. The joint is prepared to the sealant manufacturer's requirements, and every run is logged.
Part of concrete joint sealing. See also carpark and expansion joints, slab construction joints, wall and facade movement joints, hob and upstand joints. Spalled joint edges are rebuilt under concrete repair; cracks running off a joint go to crack injection.
Tell us where the joints are and roughly how many metres — we call back within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.