Hob and upstand joint sealing reseals the junctions where walls, hobs and kerbs meet the slab. Failed sealant is cut out, the joint is cleaned back to sound concrete and primed, a backing rod is set where the joint depth allows, and a new sealant goes in so water can't track under the hob.

The junction between a hob, kerb or wall and the slab moves differently from the slab itself. When that seal fails, water tracks under the upstand and shows up as drips or staining on the level below — lined up with the junction above.
Broken arrises are rebuilt before resealing — the joint edge is repaired back to sound concrete first.
Yes. Runs are staged around the site and your program.
Per lineal metre, confirmed after we measure the runs on site.
Part of concrete joint sealing. See also carpark and expansion joints, podium and balcony joints, slab construction joints, wall and facade movement joints. Spalled joint edges are rebuilt under concrete repair; cracks running off a joint go to crack injection.
Tell us where the joints are and roughly how many metres — we call back within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.