Chloride attack is salt — from sea air, de-icing or the original mix — reaching the reinforcement and driving corrosion, often faster and more locally than carbonation. We break out to clean steel, treat or replace the reo, and reinstate to the engineer's spec, including anodes or coatings where specified.

Chloride ions break down the protective layer around steel even when the concrete is still alkaline. Corrosion then concentrates in small areas — pitting — and a bar can lose section quickly without much warning on the surface. Coastal buildings, car parks and older concrete with salt in the original mix are the usual suspects across Sydney.
Patching only the visible spall leaves chloride-contaminated concrete against the steel next door. The new patch can even speed up corrosion beside it. Breaking out to the extent the engineer sets, and protecting where specified, is what makes the repair last.
The engineer. Anodes, patch extent and coatings are design decisions — we build to the spec and flag anything at breakout that doesn't match it.
Part of concrete cancer and spalling repair. See also spalling repair, carbonation repair and honeycombing and pour defect repair.
Send us the engineer's report — we call back within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.