Pull-off testing checks that the prepared concrete and the cured carbon fibre system bond as the design needs. Where the engineer specifies it, we test the prepared surface and the cured system and record the results with the batch records and installation ITPs, packaged so the engineer can release the hold point.

The engineer won't release a strengthened element until prep records, pull-off results and install records are in hand. Missing paperwork stops the project as surely as missing fibre.
We'd rather find it before the fibre goes on. If the substrate isn't sound enough to bond to, we tell you and agree the repair with you and the engineer before we go on.
The engineer's design and the system manufacturer. We test to what's specified.
Part of carbon fibre strengthening. See also slab soffit strengthening, strengthening around openings and penetrations, beam and shear strengthening, column and pier wrapping. Spalled or corroded concrete is repaired first under concrete cancer repair.
Send us the engineer's strengthening design or photos — we respond within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.