Carpark topping slab and old bitumen membrane removed, temporary membrane installed to keep the building dry, cracks repaired and injected, new waterproofing and slab, then barriers and line marking. One crew, 12 weeks.

This project is in progress. We'll add the result when it's complete.
At McElhone St, Woolloomooloo, the carpark's concrete topping slab and the bitumen membrane underneath had failed. Water was getting through to the structural slab below. The project manager needed the structure exposed, assessed, repaired and waterproofed, then the carpark handed back finished and marked out.
A failed topping slab hides what's happening underneath. Until it comes off, nobody knows how much cracking is in the structural slab or how far water has travelled. The scope had to allow for the engineer to assess the structure once it was exposed, before any repair was locked in.
Nine stages, one subcontractor, $250K over 12 weeks. Builders, remedial contractors and project managers: there's no handover between demolition, concrete, waterproofing and finishing trades. Engineers: the structure is exposed and ready for your assessment before any repair starts. Strata and asset managers: the building below stays dry while the slab is open, and the carpark comes back complete, barriers and line marking included.
Planning a carpark or podium slab replacement? Send us the scope and we'll quote it as one package.
Send photos, the engineer's report, or just the symptoms — whatever you've got. A registered builder reads it and calls you back. No call centre, no obligation.