Reo replacement and dowelling restores reinforcement that has corroded, lost section or been cut out. Bars are lapped, replaced or supplemented, and dowels or starter bars drilled and epoxied into the parent concrete — all to the engineer's details and held for inspection before any concrete goes in.

Once the concrete goes back in, the reo is buried. Laps, cover or bar sizes that don't match the engineer's details either fail the reo inspection or get covered up and fail later. That's why the reinforcement is fixed to the details and checked before anything is poured.
The engineer. We build to those details and don't design or certify structural work. If the breakout shows something the details didn't allow for, we stop and agree it before we go on.
Yes — it's a hold point. Reinforcement is fixed to the details and held for the engineer's inspection, and we don't pour until it's released. Reo, product batch and cure are recorded for your handover file.
Usually — it's the reo stage of slab edge, beam and column and large breakout reinstatement, and of re-pours after demolition.
Part of form, reo and pour. See also slab edge and balcony reinstatement, beam and column reinstatement, nib, hob and stair reinstatement, large breakout reinstatement. Small, shallow defects go to concrete cancer repair instead.
Send us the engineer's details or photos — we respond within the hour.
Send the engineer's spec, drawings or site photos — whatever you've got. We read it and call you back within the hour. No call centre, no obligation.